Skip to main content

Table 6 Monthly plant labor Costs (OPC) as the Egyptian worker salaries in government

From: Economic study for blend membrane production

Item Cost, $/month
1. Engineer (two Engineer) 400
2. Chemist (two chemist) 300
5. Skilled labor (three Labors) 300
6. Unskilled labor (two labors) 100
Total 1100